Past Projects

Utah Forge – Milford, Utah

Installations of multiple wellheads and built adapter crossovers to run different strings of casing based on the well program.

Raft River Geothermal Power Plant – Malta, Idaho

Blow out condition, work over the well, and install new wellhead.

Blundell Geothermal Power Plant – Milford, Utah

Work over well, install new wellhead, master valve, and down stream components.

Fervo Energy Blue Mountain Geothermal Plant – Winnemucca, Nevada

Installed wellhead, nipple up BOP that included a banjo box, from banjo box flow line to gate valve on poor boy, gate valve flow line to difuser, from poor boy flow line to shell shakers, modified choke and kill lines, and covered possum bellies on shell shakers.

Encana Natural Gas – Firestone, Colorado

Full mud line replacement; from the crown to the duplex pumps, modified pop offs and pulsation dampeners, plumbing from centrifugal pumps to pump manifold, and modified pump house roofs to accept height and pulsation dampeners.

Noble Energy – Elko, Nevada

Reclaiming the field, P&A the wells, and cut off multiple wellheads with a half a million pounds of down force.

Grant Canyon Oil & Gas – Railroad Valley, Nevada

Installed conductor, picture nipple, flow line, cut off conductor and installed wellhead, nipple up BOP stack, modified choke and kill lines, and modified flow line.

Heber Light & Power – Heber, Utah

Modified plumbing for new expansion joint on gens.

Breck Energy – Crescent Valley, Nevada

Installed wellhead, nipple up BOP stack, modified choke and kill lines, and modified flow line.

Elko Heat Company – Elko, Nevada

Installed conductor, picture nipple, and flow lines. Laid down flowline, cut conductor off, installed 13 3/8 landing flange and tested it, nipple up BOP stack and built new flowline. The well was under guaged and needed to be underreamed, rig welding services were provided for the underreaming job. Torqued up the bit and strapped it multiple times with different configurations of underreamers, cut off straps on underreamers, and bits to clean them up to prepare them to be reinstalled in the well bore to continue underreaming job.